PT. Persero SUCOFINDO ( 1989 sd 1995 )



 ESTIMATOR / QUANTITY SURVEYOR ( 1989 to 2000)

Initially employed as estimator Quantity Surveyor  Consultant to develop asset value based on  quantity material and overhead Cost and depreciation.

Please refer to the Table below :

 

VALUATION EXPERIENCE/ ESTIMATOR/ QUANTITY SURVEYOR

 

1. PT. Karya Nusantara , Chocolate Mfg , Surabaya ,             

2. PT. Karya Nusantara,   Printed and Book Store, surabaya,   

3   EXIM Bank, Resident House.   

4   PT. Kimberly Agung, Tissue Mfg West

5   PT. Bali Jimbaran Hotel,   Bali                                    

6.  PT. PT. Tirta Arta Mina, Resident house, Jogyakarta           

7.  PT. Berkat Sampit Group Warehouse &Theatre kalimantan   

8.  PT. Philip Ralin L glass, lamp Mfg.  Surabaya                 

9.  PT. Deta Marina Textile Mfg.   Bogor - West Java         

10 PT. Berlian Laju Tangker VLCC      Jakarta                        

11 PT.Semen Tonasa Cement Mfg. Sulawesi     )

12. PT. Petro Kimia Chemist Mfg. East Java                   

13. PT. Iradat Puri Moulding & Sound Timbe Central Sulawesi      

14. PT. Iradat Puri Forest,  Central Sulawesi                       

15. PT. Tatar Anyar Tea & Tobacco Plantation (West Java)

16. PT. Batam Jaya Hotel   Batam                                           

 

ASSIST. PROJECT MANAGER  (Hospital Building at South Sulawesi, Indonesia ) ( year 1990)

Review all technical specification, administration document, material quality and shop drawings for preparing tender preparation.

 

1. Coordinate tender process biding evaluation and preparation contract agreement with contractors and their subcontractors.

 

2. Evaluated contractors invoices as development of existing project implementation for approval payments in terms of contract. o attend meeting with Design Consultant, contractors involved design, detailing of building structures, management change, work schedule, quality control for material to be used other technical problem to meet best solution

 

 

ASSIST MANAGER BUILDING MAINTENANCE   ( For Head Office and  all Branches Office Building )

 

1. Prepare term of references ( TOR ) and budgets planning and cost break out for building renovation, purchasing fixtures & furnitures, partitions, and computer & equipments

 2.  Execute project tender to appointed contractors.

 3. Provide contract agreement include schedule, project cost, term of payments etc.

 4. Supervision quality control and progress report of project           duties based on TOR ( Terms of References )

 5. To ensure all contractors invoices are verified in accordance to  progress existing project submission for payment.

 6. Developed  budget planning/forecasting of building             maintenance  in order for proposed annual budgets.

 

 SITE SUPERVISION PROJECT MANAGER ( 1992 to 1996 )

 

  1. Performed pre survey and gathering data include land use, building licenses, number of lines telephone, electricity need, room area each department,  parking area, water consumption for building master plan purposed.

 

  1. Responsible for design planning, directing, controlling the activities involved in the project management for 17’th storey High rise building of corporate head quarters & 6’th storey Brach offices building.

 

  1. Responsible for coordination of technical  project duties, safety, time, Project Cost based upon project implementation plans.

 

  1. Coordinate with consultant on all planning and quality control of implementation progress , material test result and schedule of site project of all structural and civil works.

 

  1. Quality control and coordinating project management systems and assistance solving all technical problem wich arise in the project field.

 

  1. Compilation administration contract and other project document and propose progress report, cash flow analisys to management.

 

  1. Evaluation financial performance and term of payment in order to cash flow to be paid correctly.

 

  1. Supervise and evaluated reports carried out by consultantand contractorabout project activities from inception to completion and proposed it’s report to management periodically.

 

  1. Inspection material to be used, form works installation and slab/ beams reinforcements, levelling prior to concrete pouring and grouting  works.

 

  1. Cheqing soil test report, bored piles dimentions, slump test, compaction test of concrete for porposing non conformance corrective action.

 

  1. Direct supervision for preparation and installation of marble floors tiles, Gypsum board ceiling, partitions and wall paper, lighting installation in accordance  spesification approved and acceptance by Directors.

 

  1. Running test after equipments installation include  PABX, building automation system, water pump, hydrant, electricity distribution, fire alarm, sound system, chiller, lift, recycle water system, to ensure final handing overare achieved and accomplishments

 

 

Related product you might see:

Share this product :

Post a Comment

 
Support : Creating Website | TOKO AGUNG 318
Copyright © 2011. CATUR MARGONO - All Rights Reserved
Template Created by CATUR MARGONO, Website Published by TOKO AGUNG 318
Proudly powered by Catur Margono